OUR SERVICES

:: Rapid Prototyping ::
:: Manufacturing ::
:: Research & Development ::
:: Engineering & Technical ::
:: Homeland Security ::
:: Training Support ::
:: Composite Armor Products::

 

IED Roller Fabrication
The Army required rapid fabrication of an interface to mount a wheeled IED defeat device. SMH provided a turnkey solution to augment production from an Army facility. SMH provided full lifecycle management from end product delivery to on-site final inspection and packout.

 

 

 


Critical Small Arms Parts Production
A critical shortage of spare parts developed for a small arms weapons system. SMH provided turnkey parts fabrication, delivering first units in 8 weeks, a 60% reduction from the typical 22 week lead time. Production included first article inspection and process certification of various suppliers.

Parts Manufactured:
Extension Assembly, Barrel
P/N  5504082
NSN  1005-00-550-4082

Lock Breech
P/N  7161302
NSN  1005-00-716-1302

Spring, Locking , Barrel
PN  7266134
NSN  5360-00-726-6134

Latch, Bolt
PN  5504060
NSN  1005-00-550-4060

 

 

 


Copyright 2008 SMH International LLC. All Rights Reserved. Created and Designed by
VisionLine Media